Now here is the main cab structure with some gussets installed. The cross bracing has yet to be installed. So far I have used 60 feet of 1 ½ inch .095-wall tubing and 20 feet of .120 wall tubing just to get this far.

I have had a couple of people ask what it takes to build a good roll cage. Well here I go.
If you want to build a cage for your truck there is some tools you will need. First is the welder. Go out and find a good 220 Volt mig welder. You can use Argon Co2 mix or just Co2. Don’t use flux core. Straight Argon is for Aluminum I have used Co2 for many years and have just become accustom to how it works. A large tank can last me up to 10 years or more at home. I just replaced one of my tanks after 15 years of use. It went through 5 of the big rolls of .030 wires. Co2 burns hotter than Argon mix and you can burn through thin wall steel. It just takes time to get good. I will get into welding later on.
Now you need to find a mandrel bender. DO NOT get a pipe bender. There are some ratcheting low cost ones that work OK and make nice bends. You can find them here.
http://www.tubing-benders.com/?gclid=CPzR3ZyCv6ICFQ4iawod4Gxx3A
But if you really want to do the job right then you can expect to spend around 1200 bucks for a good quality tool. Here is a good source for tools and lots of other things you will need to do the job. Keep in mind if you buy something good you only need to buy it once. They still make and sell the tools I picked up back in 1997. You can get a low buck tubing notcher.
http://www.irvansmith.com/scart/index.php
Now when it comes to tools you get what you pay for. I have spent the last 20 years filling up my box. Yard sales, auctions things like that. I set a goal and then collect parts until I have enough to get going on it. Here is my garage and some supplies that people have tossed out that I have found over the years. My nut and bolt collection was a major score.
Now lets talk a little about welding.
"When welding tubing you need to keep an eye on the fit of the tubing." If you have a large gap then you will “burn through” You can fill the gap but it takes time and every time you start and stop the fusion of the metal you take a chance of O2 getting into the weld and producing a pimple or “zit hole”. If you have the gas flow up to high wile using Co2 you can over heat the steel. I run around 12 Cubic Inch Hour. At this rate I can get a good Spray of metal. There are times when it can be an advantage to use a Globular transfer method, manley when filling a large gap between to parts. If the gap is large or the parts are thin there is the option to noodle weld.


Make the fit on your tubing as tight as you can. Spend the extra time and do it right, there is no shortcut in frame building. Remember the forces that will be applied to the cage.